Service in Thailand

Pound Reclamation

  • Increase stability during construction
  • Reduce post construction settlement
  • No berm required
  • Save time
  • Minimize long-term settlement during the construction

High Embankment in Bangkok (9-11m.)

  • Accelerate a Settlement
  • Increase a Stability for High Embankment construction

Riverbank Stabilization

  • Apply Vacuum Consolidation Built 3m Embankment
  • Accelerate a Settlement
  • Increase a Stability for High Embankment construction
  • Increase soil strength
Scroll to Top